Garrett Curley
- Login: curley
- Registered on: 27/06/2019
- Last connection: 20/11/2023
Issues
open | closed | Total | |
---|---|---|---|
Assigned issues | 2 | 0 | 2 |
Reported issues | 2 | 0 | 2 |
Projects
Project | Roles | Registered on |
---|---|---|
Com | Developer, Reporter, WikiFullRight | 27/06/2019 |
INCLINE - ICP | Manager | 18/09/2019 |
Activity
08/04/2022
- 05:10 PM Matériels Downloaded: Pressure/Controller/TPG300/TPG 300
26/09/2019
- 01:36 PM INCLINE - ICP Bug #3424 (Resolved): Mains water supply interruption
- 11am: switched pump controller on/off.
Allowed controller to heat up to ~ 60 °C.
Switched on. Turbo OK.
1:30pm Ba... - 10:11 AM INCLINE - ICP Bug #3424 (Resolved): Mains water supply interruption
- The mains water supply was interrupted during the morning (6 am ish).
Primary pump overheated, so shut down.
Rise...
19/09/2019
- 01:02 PM INCLINE - ICP Task #3421: Repair Cl2 mass flow controller
- Subject: RE: reparation 5850TR
Date: Thu, 19 Sep 2019 11:31:42 +0200
From: sebastien.briere@servinstrumentation.... - 11:40 AM INCLINE - ICP Task #3421 (New): Repair Cl2 mass flow controller
- Defective Brooks Model 5850TR
Also available in: Atom