General

Profile

Garrett Curley

  • Login: curley
  • Registered on: 27/06/2019
  • Last connection: 20/11/2023

Issues

open closed Total
Assigned issues 2 0 2
Reported issues 2 0 2

Projects

Project Roles Registered on
Com Developer, Reporter, WikiFullRight 27/06/2019
INCLINE - ICP Manager 18/09/2019

Activity

08/04/2022

05:10 PM Matériels Downloaded: Pressure/Controller/TPG300/TPG 300
Garrett Curley

26/09/2019

01:36 PM INCLINE - ICP Bug #3424 (Resolved): Mains water supply interruption
11am: switched pump controller on/off.
Allowed controller to heat up to ~ 60 °C.
Switched on. Turbo OK.
1:30pm Ba...
Garrett Curley
10:11 AM INCLINE - ICP Bug #3424 (Resolved): Mains water supply interruption
The mains water supply was interrupted during the morning (6 am ish).
Primary pump overheated, so shut down.
Rise...
Garrett Curley

19/09/2019

01:02 PM INCLINE - ICP Task #3421: Repair Cl2 mass flow controller
Subject: RE: reparation 5850TR
Date: Thu, 19 Sep 2019 11:31:42 +0200
From: sebastien.briere@servinstrumentation....
Garrett Curley
11:40 AM INCLINE - ICP Task #3421 (New): Repair Cl2 mass flow controller
Defective Brooks Model 5850TR Garrett Curley

Also available in: Atom