Project

General

Profile

Activity

From 28/08/2019 to 26/09/2019

26/09/2019

01:36 PM Bug #3424 (Resolved): Mains water supply interruption
11am: switched pump controller on/off.
Allowed controller to heat up to ~ 60 °C.
Switched on. Turbo OK.
1:30pm Ba...
Garrett Curley
10:11 AM Bug #3424 (Resolved): Mains water supply interruption
The mains water supply was interrupted during the morning (6 am ish).
Primary pump overheated, so shut down.
Rise...
Garrett Curley

19/09/2019

01:02 PM Task #3421: Repair Cl2 mass flow controller
Subject: RE: reparation 5850TR
Date: Thu, 19 Sep 2019 11:31:42 +0200
From: sebastien.briere@servinstrumentation....
Garrett Curley
11:40 AM Task #3421 (New): Repair Cl2 mass flow controller
Defective Brooks Model 5850TR Garrett Curley
 

Also available in: Atom